Google+

contact us

Use the form on the right to contact us.

Day or Night, we are here to serve you. Leave your plumbing problem to us.

 


Tinley Park, IL

(708)845-7922

Residential and Commercial plumbers and plumbing contractors available in Orland Park, Tinley Park, Oak Lawn, Palos Heights, Midlothian, Oak Forest, Homer Glen, Mokena, Frankfort, and the surrounding Chicago South Suburbs. Emergency plumbers.

Kevin Szabo Jr Plumbing Blog

Kevin Szabo Jr Plumbing is Tinley Park, Orland Park, Oak Forest, Midlothian, Orland Hill, Homer Glen, Mokena, Frankfort, Crestwood, Palos Heights, Oak Lawn, local plumber. Read our blog for advice, tips, a good laugh, and basic home improvement.

**We are moving our old blog to our new and improved website. Too see all our posts visit kevinszabojrplumbing.blogspot.com

Concrete Management and The Construction Budget

RH Business Marketing Solutions

Concrete is a basic construction material and it is necessary to manage concrete for construction projects. Normally Concrete is a mixture of Cement, Sand, Gravel, and Water, you may include stone in it. You may mix iron with the changing quality of concrete. The construction budget is managed by reducing concrete costs.  Concrete wastage is the major reason for increasing construction costs. 

The concrete calculator makes it possible to order the optimal quantity of concrete ingredients. You need to understand concrete ingredients like cement do lose their quality after 7 to 8 days. Construction managers do need to reduce the wastage of concrete to manage the overall cost of construction.

Reason to Calculate Concrete Cost

There are multiple reasons for managing concrete costs in the construction project.

Concrete A Bottleneck

Concrete cost is a bottleneck for a construction project. Once you can manage the cost of concrete for a construction project. Then you can reduce the overall cost of construction. For a better estimation of construction cost, it is necessary to know how much does concrete costs. 

The major construction materials like cement, gravel, and sand are involved in concrete. Concrete is one of the most costly materials and hence a bottleneck for construction projects. The cost of concrete cost calculator assists in managing the cost of concrete and its total cost.

  • Concrete is a bottleneck for construction projects and it is necessary to manage its cost.

Changing Ratio of Concrete

The ratio of concrete is different for various places, you may need to reduce the cement quantity in various places. Once you enter the concrete ratio in a concrete calculator, then you can calculate. The actual ratio of concrete for a specific process.  In some projects, you may need concrete blocks like square or rectangular blocks. You simply need to enter the length, depth, and height of concrete blocks and the tools will calculate its cost and quantity.

  • The concrete ratio is different for various places, so it is essential to make the mixture according to the required manner.

How Many Yards of Concrete?

Let's suppose there are 5000 Circular Concrete slabs required to complete a certain project of construction. They calculate the total yards of concrete for the construction project.

The dimensions of the Circular Concrete Slab are:

The diameter of the concrete slab = 2 ft 

Depth of the concrete slab = 10 Inches

Per Unit cost of Concrete Slab = $ 5

Required Number of Concrete = 5000 circular concrete slab 

Solution

Circular Slab Depth =  10/12 = 0.833 ft 

Radius of Circular Slab = 2/2 = 1 ft 

Area of Slab = 3.14[Radius]^2 ft^2

Area of Slab = 3.14[1]^ ft^2

Area of Slab = 3.14 ft^2

Volume of Slab = (Depth)(Area)

Volume of Slab = (0.833)(3.14)

Volume of Slab= 2.62 ft^3

Volume of 5000 Slab  = (2.62  ft^3)(5000)

Volume of 5000 Slab = 13100 ft^3

Volume of 5000 Slab in = 13100 ft^3

Now to convert square feet to square yards, divide 13100 ft^3 by 27.

As 

1 cubic yard = 27 cubic feet

Volume of 5000 Slab in cubic yard = 13100/27 

Volume of 5000 Slab in cubic yard = 485.186 Cubic Yard

Cost of total 5000 slabs = ($5)(5,000)

Cost of total 5000 slabs  = $ 2,5000

The concrete calculator assists in knowing the total quantity of concrete and its total cost. This is necessary to manage the total cost of concrete and its volume. Concrete is one of the most costly materials in the construction industry. You can only reduce the wastage level by managing concrete costs. You can say concrete is one of the major bottlenecks in the construction industry.

Conclusion

It is necessary to manage concrete quantity to reduce construction costs. Most of the time, concrete ingredients are wasted during construction projects. The basic reason for calculating concrete is to manage the total cost of construction.